Construction Material Prices in Ethiopia 2026 — Source Reference

ADDIS ABABA • ETHIOPIA

Construction material prices in Ethiopia

Find the right reference. Understand the unit. Build a better budget.

የግንባታ ዋጋዎችን በምድብ ይመልከቱ፤ መለኪያውን ያረጋግጡ።

Know what the price covers. Material selling prices, construction work rates, labour and equipment hire are separate. This is a 2018 E.C. Q4 reference, not a live supplier quotation. The material table excludes VAT and states loading, unloading and transportation are included. Confirm current supply terms with Conmart.
23organized categories
53source document pages
232digitized & visually checked rates
ETBEthiopian birr · original units
SOURCE-BASED PRICE DIRECTORY

All checked prices

Compare the right specification and unit. Open a category to read its complete source tables.

232 checked rates
Checked reference prices in Ethiopian birr. Units and source pages are shown for each entry.
Material / specificationReference rateEstimate
Cement (PPC)Cement · Material · Excl. VATSource: PDF p. 49 ↗2,100.00ETB / quintal
Cement (OPC)Cement · Material · Excl. VATSource: PDF p. 49 ↗2,400.00ETB / quintal
Local Rebar Grade 75 (Ethiopia)Rebar supply · Material · Excl. VATSource: PDF p. 49 ↗200.00ETB / kg
Imported Rebar Grade 75Rebar supply · Material · Excl. VATSource: PDF p. 49 ↗205.00ETB / kg
SandSand, aggregates & blocks · Material · Excl. VATSource: PDF p. 49 ↗6,250.00ETB / m³
Gravel 02Sand, aggregates & blocks · Material · Excl. VATSource: PDF p. 49 ↗5,625.00ETB / m³
FINO (01)Sand, aggregates & blocks · Material · Excl. VATSource: PDF p. 49 ↗5,727.00ETB / m³
FINO (00)Sand, aggregates & blocks · Material · Excl. VATSource: PDF p. 49 ↗6,562.00ETB / m³
Red ashSand, aggregates & blocks · Material · Excl. VATSource: PDF p. 49 ↗2,717.00ETB / m³
StoneSand, aggregates & blocks · Material · Excl. VATSource: PDF p. 49 ↗2,850.00ETB / m³
BrickSand, aggregates & blocks · Material · Excl. VATSource: PDF p. 49 ↗30.00ETB / piece
Stone for hardcoreSand, aggregates & blocks · Material · Excl. VATSource: PDF p. 49 ↗2,196.00ETB / m³
Selected material — up to 5 km from quarry to project siteSand, aggregates & blocks · Material · Excl. VATSource: PDF p. 49 ↗729.50ETB / m³
Selected material — up to 10 km from quarry to project siteSand, aggregates & blocks · Material · Excl. VATSource: PDF p. 49 ↗1,042.00ETB / m³
Selected material — up to 15 km from quarry to project siteSand, aggregates & blocks · Material · Excl. VATSource: PDF p. 49 ↗1,354.50ETB / m³
Selected material — up to 20 km from quarry to project siteSand, aggregates & blocks · Material · Excl. VATSource: PDF p. 49 ↗1,667.00ETB / m³
Local Granite flooring (1:3), 2 cm thickMarble & granite supply · Material · Excl. VATSource: PDF p. 49 ↗7,300.00ETB / m²
Local Granite flooring (1:3), 3 cm thickMarble & granite supply · Material · Excl. VATSource: PDF p. 49 ↗7,500.00ETB / m²
Local Marble flooring (1:3), 2 cm thickMarble & granite supply · Material · Excl. VATSource: PDF p. 49 ↗6,600.00ETB / m²
Local Marble flooring (1:3), 3 cm thickMarble & granite supply · Material · Excl. VATSource: PDF p. 49 ↗6,750.00ETB / m²
Bar bender assistantLabour by trade · LabourSource: PDF p. 50 ↗90.00ETB / hour
Bar benderLabour by trade · LabourSource: PDF p. 50 ↗134.93ETB / hour
Carpenter assistantLabour by trade · LabourSource: PDF p. 50 ↗97.61ETB / hour
CarpenterLabour by trade · LabourSource: PDF p. 50 ↗180.00ETB / hour
ChislerLabour by trade · LabourSource: PDF p. 50 ↗93.56ETB / hour
DL (source abbreviation)Labour by trade · LabourSource: PDF p. 50 ↗80.00ETB / hour
Electrician helperLabour by trade · LabourSource: PDF p. 50 ↗117.90ETB / hour
ElectricianLabour by trade · LabourSource: PDF p. 50 ↗180.00ETB / hour
ForemanLabour by trade · LabourSource: PDF p. 50 ↗161.91ETB / hour
Gang chiefLabour by trade · LabourSource: PDF p. 50 ↗129.01ETB / hour
GlazerLabour by trade · LabourSource: PDF p. 50 ↗180.00ETB / hour
Mason assistantLabour by trade · LabourSource: PDF p. 50 ↗90.00ETB / hour
MasonLabour by trade · LabourSource: PDF p. 50 ↗180.00ETB / hour
Mixer operatorLabour by trade · LabourSource: PDF p. 50 ↗63.10ETB / hour
Painter assistantLabour by trade · LabourSource: PDF p. 50 ↗82.51ETB / hour
PainterLabour by trade · LabourSource: PDF p. 50 ↗120.00ETB / hour
Plasterer assistantLabour by trade · LabourSource: PDF p. 50 ↗84.26ETB / hour
PlastererLabour by trade · LabourSource: PDF p. 50 ↗126.19ETB / hour
Plumber helperLabour by trade · LabourSource: PDF p. 50 ↗92.41ETB / hour
PlumberLabour by trade · LabourSource: PDF p. 50 ↗180.00ETB / hour
Tiler assistantLabour by trade · LabourSource: PDF p. 50 ↗107.46ETB / hour
TilerLabour by trade · LabourSource: PDF p. 50 ↗180.00ETB / hour
Time keeperLabour by trade · LabourSource: PDF p. 50 ↗93.07ETB / hour
Truck driverLabour by trade · LabourSource: PDF p. 50 ↗119.90ETB / hour
Equipment operator ILabour by trade · LabourSource: PDF p. 50 ↗89.05ETB / hour
Equipment operator IILabour by trade · LabourSource: PDF p. 50 ↗83.25ETB / hour
Equipment operator IIILabour by trade · LabourSource: PDF p. 50 ↗78.82ETB / hour
Vibrator operatorLabour by trade · LabourSource: PDF p. 50 ↗124.87ETB / hour
Light vehicle driver ILabour by trade · LabourSource: PDF p. 50 ↗97.56ETB / hour
SurveyorLabour by trade · LabourSource: PDF p. 50 ↗125.00ETB / hour
WelderLabour by trade · LabourSource: PDF p. 50 ↗180.00ETB / hour
Welder assistantLabour by trade · LabourSource: PDF p. 51 ↗80.65ETB / hour
Aluminium workerLabour by trade · LabourSource: PDF p. 51 ↗180.00ETB / hour
Aluminium worker assistantLabour by trade · LabourSource: PDF p. 51 ↗81.89ETB / hour
Mud workerLabour by trade · LabourSource: PDF p. 51 ↗81.29ETB / hour
Truck 16 m³Equipment & machinery rental · EquipmentSource: PDF p. 52 ↗7,009.20ETB / hour
Truck 9 m³Equipment & machinery rental · EquipmentSource: PDF p. 52 ↗2,560.36ETB / hour
Truck 13 m³Equipment & machinery rental · EquipmentSource: PDF p. 52 ↗3,251.20ETB / hour
CompactorEquipment & machinery rental · EquipmentSource: PDF p. 52 ↗678.05ETB / hour
Wheel loader 200 HP (1.5–2.5 m³)Equipment & machinery rental · EquipmentSource: PDF p. 52 ↗6,297.13ETB / hour
Dozer 300 HP (D7R)Equipment & machinery rental · EquipmentSource: PDF p. 52 ↗9,610.35ETB / hour
Dozer D7R with ripperEquipment & machinery rental · EquipmentSource: PDF p. 52 ↗10,060.35ETB / hour
Dozer (200–250 HP)Equipment & machinery rental · EquipmentSource: PDF p. 52 ↗8,867.34ETB / hour
Excavator (200 HP)Equipment & machinery rental · EquipmentSource: PDF p. 52 ↗8,560.35ETB / hour
Excavator (200 HP) with ripperEquipment & machinery rental · EquipmentSource: PDF p. 52 ↗9,131.04ETB / hour
Backhoe excavator (120 HP)Equipment & machinery rental · EquipmentSource: PDF p. 52 ↗6,560.35ETB / hour
Grader (120–150 HP)Equipment & machinery rental · EquipmentSource: PDF p. 52 ↗7,560.35ETB / hour
Roller (8–10 ton)Equipment & machinery rental · EquipmentSource: PDF p. 52 ↗4,304.60ETB / hour
Water truck 13,000 litresEquipment & machinery rental · EquipmentSource: PDF p. 52 ↗4,195.20ETB / hour
Air compressorEquipment & machinery rental · EquipmentSource: PDF p. 52 ↗3,657.34ETB / hour
Hand jack hammer (electrical)Equipment & machinery rental · EquipmentSource: PDF p. 52 ↗264.00ETB / hour
Wagon drillerEquipment & machinery rental · EquipmentSource: PDF p. 52 ↗9,465.22ETB / hour
Small vehicle (pickup 4WD)Equipment & machinery rental · EquipmentSource: PDF p. 52 ↗1,251.54ETB / hour
Asphalt distributorEquipment & machinery rental · EquipmentSource: PDF p. 52 ↗5,166.50ETB / hour
Stationary heaterEquipment & machinery rental · EquipmentSource: PDF p. 52 ↗3,451.86ETB / hour
Power broomEquipment & machinery rental · EquipmentSource: PDF p. 52 ↗2,380.24ETB / hour
Asphalt plantEquipment & machinery rental · EquipmentSource: PDF p. 52 ↗51,858.19ETB / hour
Asphalt paverEquipment & machinery rental · EquipmentSource: PDF p. 52 ↗11,433.22ETB / hour
Pneumatic rollerEquipment & machinery rental · EquipmentSource: PDF p. 52 ↗4,133.65ETB / hour
Water tankerEquipment & machinery rental · EquipmentSource: PDF p. 52 ↗38.05ETB / hour
Dump truck 16 m³Equipment & machinery rental · EquipmentSource: PDF p. 52 ↗2,784.53ETB / hour
Crushing plant 75 tonEquipment & machinery rental · EquipmentSource: PDF p. 52 ↗19,952.80ETB / hour
Centrifugal water pumpEquipment & machinery rental · EquipmentSource: PDF p. 52 ↗499.85ETB / hour
Generator (45 kW)Equipment & machinery rental · EquipmentSource: PDF p. 52 ↗935.89ETB / hour
Mobile craneEquipment & machinery rental · EquipmentSource: PDF p. 52 ↗7,609.20ETB / hour
Concrete mixer (300 litres)Equipment & machinery rental · EquipmentSource: PDF p. 52 ↗519.22ETB / hour
Concrete mixer truckEquipment & machinery rental · EquipmentSource: PDF p. 52 ↗3,098.82ETB / hour
Concrete vibratorEquipment & machinery rental · EquipmentSource: PDF p. 53 ↗266.09ETB / hour
Hand tamperEquipment & machinery rental · EquipmentSource: PDF p. 53 ↗110.47ETB / hour
Pipe mouldEquipment & machinery rental · EquipmentSource: PDF p. 53 ↗24.85ETB / hour
Painting machineEquipment & machinery rental · EquipmentSource: PDF p. 53 ↗1,253.57ETB / hour
Hand drillEquipment & machinery rental · EquipmentSource: PDF p. 53 ↗20.71ETB / hour
Gear machineEquipment & machinery rental · EquipmentSource: PDF p. 53 ↗34.52ETB / hour
GrinderEquipment & machinery rental · EquipmentSource: PDF p. 53 ↗34.52ETB / hour
Cutting disc (diameter 180)Equipment & machinery rental · EquipmentSource: PDF p. 53 ↗162.00ETB / hour
ScaffoldingEquipment & machinery rental · EquipmentSource: PDF p. 53 ↗117.60ETB / hour
Sledge hammerEquipment & machinery rental · EquipmentSource: PDF p. 53 ↗6.28ETB / hour
ToolsEquipment & machinery rental · EquipmentSource: PDF p. 53 ↗14.40ETB / hour
Set of toolsEquipment & machinery rental · EquipmentSource: PDF p. 53 ↗22.80ETB / hour
Surveying instrumentEquipment & machinery rental · EquipmentSource: PDF p. 53 ↗129.24ETB / hour
Welding machineEquipment & machinery rental · EquipmentSource: PDF p. 53 ↗101.20ETB / hour
Hydraulic truck crane, 20–25 tonEquipment & machinery rental · EquipmentSource: PDF p. 53 ↗5,383.58ETB / hour
Winch 3-phaseEquipment & machinery rental · EquipmentSource: PDF p. 53 ↗251.04ETB / hour
Winch single phaseEquipment & machinery rental · EquipmentSource: PDF p. 53 ↗188.28ETB / hour
Generator 3-phaseEquipment & machinery rental · EquipmentSource: PDF p. 53 ↗502.08ETB / hour
Generator single phaseEquipment & machinery rental · EquipmentSource: PDF p. 53 ↗313.80ETB / hour
Generator for winch 3-phaseEquipment & machinery rental · EquipmentSource: PDF p. 53 ↗403.92ETB / hour
Local Grade 75 rebar work, 6 mm — SubstructureReinforcement work · WorksSource: PDF p. 15 ↗246.97ETB / kg
Local Grade 75 rebar work, 8 mm — SubstructureReinforcement work · WorksSource: PDF p. 15 ↗242.06ETB / kg
Local Grade 75 rebar work, 10 mm — SubstructureReinforcement work · WorksSource: PDF p. 15 ↗242.06ETB / kg
Local Grade 75 rebar work, 12 mm — SubstructureReinforcement work · WorksSource: PDF p. 15 ↗238.74ETB / kg
Local Grade 75 rebar work, 14 mm — SubstructureReinforcement work · WorksSource: PDF p. 15 ↗238.74ETB / kg
Local Grade 75 rebar work, 16 mm — SubstructureReinforcement work · WorksSource: PDF p. 15 ↗238.74ETB / kg
Local Grade 75 rebar work, 20 mm — SubstructureReinforcement work · WorksSource: PDF p. 15 ↗238.74ETB / kg
Local Grade 75 rebar work, 24 mm — SubstructureReinforcement work · WorksSource: PDF p. 15 ↗238.74ETB / kg
Local Grade 75 rebar work, 32 mm — SubstructureReinforcement work · WorksSource: PDF p. 15 ↗238.74ETB / kg
Local Grade 75 rebar work, 6 mm — SuperstructureReinforcement work · WorksSource: PDF p. 15 ↗249.12ETB / kg
Local Grade 75 rebar work, 8 mm — SuperstructureReinforcement work · WorksSource: PDF p. 15 ↗249.12ETB / kg
Local Grade 75 rebar work, 10 mm — SuperstructureReinforcement work · WorksSource: PDF p. 15 ↗249.12ETB / kg
Local Grade 75 rebar work, 12 mm — SuperstructureReinforcement work · WorksSource: PDF p. 15 ↗241.72ETB / kg
Local Grade 75 rebar work, 14 mm — SuperstructureReinforcement work · WorksSource: PDF p. 15 ↗241.72ETB / kg
Local Grade 75 rebar work, 16 mm — SuperstructureReinforcement work · WorksSource: PDF p. 15 ↗241.72ETB / kg
Local Grade 75 rebar work, 20 mm — SuperstructureReinforcement work · WorksSource: PDF p. 15 ↗241.72ETB / kg
Local Grade 75 rebar work, 24 mm — SuperstructureReinforcement work · WorksSource: PDF p. 15 ↗241.72ETB / kg
Local Grade 75 rebar work, 32 mm — SuperstructureReinforcement work · WorksSource: PDF p. 15 ↗241.72ETB / kg
Imported Grade 75 rebar work, 8 mm — SubstructureReinforcement work · WorksSource: PDF p. 15 ↗252.12ETB / kg
Imported Grade 75 rebar work, 10 mm — SubstructureReinforcement work · WorksSource: PDF p. 15 ↗252.12ETB / kg
Imported Grade 75 rebar work, 12 mm — SubstructureReinforcement work · WorksSource: PDF p. 15 ↗243.89ETB / kg
Imported Grade 75 rebar work, 14 mm — SubstructureReinforcement work · WorksSource: PDF p. 15 ↗243.89ETB / kg
Imported Grade 75 rebar work, 16 mm — SubstructureReinforcement work · WorksSource: PDF p. 15 ↗243.89ETB / kg
Imported Grade 75 rebar work, 20 mm — SubstructureReinforcement work · WorksSource: PDF p. 15 ↗243.89ETB / kg
Imported Grade 75 rebar work, 24 mm — SubstructureReinforcement work · WorksSource: PDF p. 15 ↗243.89ETB / kg
Imported Grade 75 rebar work, 30 mm — SubstructureReinforcement work · WorksSource: PDF p. 15 ↗243.89ETB / kg
Imported Grade 75 rebar work, 32 mm — SubstructureReinforcement work · WorksSource: PDF p. 15 ↗243.89ETB / kg
Imported Grade 75 rebar work, 8 mm — SuperstructureReinforcement work · WorksSource: PDF p. 15 ↗260.35ETB / kg
Imported Grade 75 rebar work, 10 mm — SuperstructureReinforcement work · WorksSource: PDF p. 15 ↗260.35ETB / kg
Imported Grade 75 rebar work, 12 mm — SuperstructureReinforcement work · WorksSource: PDF p. 15 ↗246.87ETB / kg
Imported Grade 75 rebar work, 14 mm — SuperstructureReinforcement work · WorksSource: PDF p. 15 ↗246.87ETB / kg
Imported Grade 75 rebar work, 16 mm — SuperstructureReinforcement work · WorksSource: PDF p. 15 ↗246.87ETB / kg
Imported Grade 75 rebar work, 20 mm — SuperstructureReinforcement work · WorksSource: PDF p. 15 ↗246.87ETB / kg
Imported Grade 75 rebar work, 24 mm — SuperstructureReinforcement work · WorksSource: PDF p. 15 ↗251.95ETB / kg
Imported Grade 75 rebar work, 30 mm — SuperstructureReinforcement work · WorksSource: PDF p. 15 ↗246.87ETB / kg
Imported Grade 75 rebar work, 32 mm — SuperstructureReinforcement work · WorksSource: PDF p. 15 ↗246.87ETB / kg
Galvanized EGA 300 roof cover, 0.30 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗1,596.25ETB / m²
Galvanized EGA 300 roof cover, 0.35 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗1,785.51ETB / m²
Galvanized EGA 300 roof cover, 0.40 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗1,958.45ETB / m²
Galvanized EGA 300 roof cover, 0.50 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,135.55ETB / m²
Galvanized EGA 300 roof cover, 0.60 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,385.35ETB / m²
Galvanized EGA 300 roof cover, 0.70 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,632.49ETB / m²
Galvanized EGA 300 roof cover, 0.80 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,863.96ETB / m²
Galvanized EGA 300 roof cover, 1.00 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗3,107.64ETB / m²
Galvanized EGA 400 roof cover, 0.30 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗1,780.73ETB / m²
Galvanized EGA 400 roof cover, 0.35 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗1,987.74ETB / m²
Galvanized EGA 400 roof cover, 0.40 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,217.70ETB / m²
Galvanized EGA 400 roof cover, 0.50 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,430.31ETB / m²
Galvanized EGA 400 roof cover, 0.60 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,623.64ETB / m²
Galvanized EGA 400 roof cover, 0.70 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,847.72ETB / m²
Galvanized EGA 400 roof cover, 0.80 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗3,071.13ETB / m²
Galvanized EGA 400 roof cover, 1.00 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗3,264.50ETB / m²
Galvanized EGA 500 roof cover, 0.30 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗1,846.07ETB / m²
Galvanized EGA 500 roof cover, 0.35 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,116.70ETB / m²
Galvanized EGA 500 roof cover, 0.40 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,300.15ETB / m²
Galvanized EGA 500 roof cover, 0.50 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,523.61ETB / m²
Galvanized EGA 500 roof cover, 0.60 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,731.78ETB / m²
Galvanized EGA 500 roof cover, 0.70 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,935.84ETB / m²
Galvanized EGA 500 roof cover, 0.80 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗3,213.53ETB / m²
Galvanized EGA 500 roof cover, 1.00 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗3,488.80ETB / m²
Galvanized EGA 600 roof cover, 0.30 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗1,915.24ETB / m²
Galvanized EGA 600 roof cover, 0.35 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,110.72ETB / m²
Galvanized EGA 600 roof cover, 0.40 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,313.65ETB / m²
Galvanized EGA 600 roof cover, 0.50 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,543.02ETB / m²
Galvanized EGA 600 roof cover, 0.60 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,756.42ETB / m²
Galvanized EGA 600 roof cover, 0.70 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,977.88ETB / m²
Galvanized EGA 600 roof cover, 0.80 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗3,263.52ETB / m²
Galvanized EGA 600 roof cover, 1.00 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗3,584.72ETB / m²
Galvanized EGA 700 roof cover, 0.30 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗1,997.42ETB / m²
Galvanized EGA 700 roof cover, 0.35 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,153.62ETB / m²
Galvanized EGA 700 roof cover, 0.40 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,329.62ETB / m²
Galvanized EGA 700 roof cover, 0.50 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,631.07ETB / m²
Galvanized EGA 700 roof cover, 0.60 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,765.22ETB / m²
Galvanized EGA 700 roof cover, 0.70 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗2,988.52ETB / m²
Galvanized EGA 700 roof cover, 0.80 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗3,289.92ETB / m²
Galvanized EGA 700 roof cover, 1.00 mm (includes J-bolt)Roofing & rainwater goods · WorksSource: PDF p. 18 ↗3,601.22ETB / m²
EGA 0.4 mm (G28) coated roof coverRoofing & rainwater goods · WorksSource: PDF p. 18 ↗1,929.94ETB / m²
EGA 0.4 mm (G28) coated wall coverRoofing & rainwater goods · WorksSource: PDF p. 18 ↗1,754.90ETB / m²
EGA 0.4 mm (G28) coated wall with 10 cm vertical and 6 cm horizontal eucalyptus membersRoofing & rainwater goods · WorksSource: PDF p. 18 ↗2,022.07ETB / m²
Galvanized gutter G28, developed length 33 cmRoofing & rainwater goods · WorksSource: PDF p. 18 ↗821.83ETB / linear m
Galvanized gutter G30, developed length 33 cmRoofing & rainwater goods · WorksSource: PDF p. 18 ↗750.07ETB / linear m
Galvanized gutter G28, developed length 40 cmRoofing & rainwater goods · WorksSource: PDF p. 18 ↗968.35ETB / linear m
Galvanized gutter G30, developed length 40 cmRoofing & rainwater goods · WorksSource: PDF p. 18 ↗864.31ETB / linear m
Galvanized gutter G28, developed length 50 cmRoofing & rainwater goods · WorksSource: PDF p. 18 ↗1,157.05ETB / linear m
Galvanized gutter G30, developed length 50 cmRoofing & rainwater goods · WorksSource: PDF p. 18 ↗920.41ETB / linear m
Galvanized gutter G28, developed length 67 cmRoofing & rainwater goods · WorksSource: PDF p. 18 ↗1,332.49ETB / linear m
Galvanized gutter G30, developed length 67 cmRoofing & rainwater goods · WorksSource: PDF p. 18 ↗1,051.99ETB / linear m
Galvanized gutter G28, developed length 100 cmRoofing & rainwater goods · WorksSource: PDF p. 18 ↗1,470.71ETB / linear m
Galvanized gutter G30, developed length 100 cmRoofing & rainwater goods · WorksSource: PDF p. 18 ↗1,299.85ETB / linear m
Galvanized downpipe G28, developed length 33 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗854.07ETB / linear m
Galvanized downpipe G30, developed length 33 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗854.07ETB / linear m
Galvanized downpipe G28, developed length 40 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗1,012.90ETB / linear m
Galvanized downpipe G30, developed length 40 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗857.70ETB / linear m
Galvanized downpipe G28, developed length 50 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗1,077.46ETB / linear m
Galvanized downpipe G30, developed length 50 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗1,044.66ETB / linear m
Galvanized flashing G30, developed length 50 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗1,082.14ETB / linear m
Galvanized flashing G30, developed length 67 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗1,192.91ETB / linear m
Galvanized flashing G30, developed length 100 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗1,497.41ETB / linear m
Galvanized flashing G28, developed length 50 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗1,264.84ETB / linear m
Galvanized flashing G28, developed length 67 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗1,472.74ETB / linear m
Galvanized flashing G28, developed length 100 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗1,590.48ETB / linear m
Galvanized capping G28, developed length 25 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗620.78ETB / linear m
Galvanized capping G30, developed length 25 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗615.68ETB / linear m
Galvanized capping G28, developed length 33 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗856.77ETB / linear m
Galvanized capping G30, developed length 33 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗616.70ETB / linear m
Galvanized capping G28, developed length 50 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗865.58ETB / linear m
Galvanized capping G30, developed length 50 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗824.78ETB / linear m
Galvanized roof ridge G28, developed length 33 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗759.81ETB / linear m
Galvanized roof ridge G30, developed length 33 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗657.81ETB / linear m
Galvanized roof ridge G28, developed length 50 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗889.35ETB / linear m
Galvanized roof ridge G30, developed length 50 cmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗792.45ETB / linear m
PVC downpipe PN4, 75 mm diameterRoofing & rainwater goods · WorksSource: PDF p. 19 ↗469.41ETB / linear m
PVC downpipe PN4, 110 mm diameterRoofing & rainwater goods · WorksSource: PDF p. 19 ↗567.84ETB / linear m
PVC downpipe PN4, 160 mm diameterRoofing & rainwater goods · WorksSource: PDF p. 19 ↗1,019.08ETB / linear m
G28 corrugated iron sheet roof work, without truss and purlinRoofing & rainwater goods · WorksSource: PDF p. 19 ↗1,370.13ETB / m²
G30 corrugated iron sheet roof work, without truss and purlinRoofing & rainwater goods · WorksSource: PDF p. 19 ↗1,229.59ETB / m²
G32 corrugated iron sheet roof work, without truss and purlinRoofing & rainwater goods · WorksSource: PDF p. 19 ↗997.16ETB / m²
G35 corrugated iron sheet roof work, without truss and purlinRoofing & rainwater goods · WorksSource: PDF p. 19 ↗833.46ETB / m²
Aspesto roof cover with all necessary works (source wording)Roofing & rainwater goods · WorksSource: PDF p. 19 ↗847.68ETB / m²
Euro tile roof cover with all necessary worksRoofing & rainwater goods · WorksSource: PDF p. 19 ↗878.88ETB / m²
Grass roof cover with all necessary worksRoofing & rainwater goods · WorksSource: PDF p. 19 ↗825.13ETB / m²
Transparent fibre roof cover, corrugated, 2 mmRoofing & rainwater goods · WorksSource: PDF p. 19 ↗1,257.17ETB / m²
G32 CIS roof with Shashemene Zigba purlin (4 × 5 cm)Roofing & rainwater goods · WorksSource: PDF p. 19 ↗1,412.24ETB / m²
Tsid timber cladding, 1 cm, for decorating roof purlinRoofing & rainwater goods · WorksSource: PDF p. 19 ↗1,453.56ETB / m²
Lightweight concrete 1:2:5 for roofRoofing & rainwater goods · WorksSource: PDF p. 19 ↗15,754.06ETB / m³

Complete source tables

Every category includes its original PDF pages. Search and estimates use visually checked transcriptions; additional work rates remain available in the full source tables.

PDF page 6 ↗Printed page 1 · full original tablePDF page 7 ↗Printed page 2 · full original tablePDF page 8 ↗Printed page 3 · full original tablePDF page 9 ↗Printed page 4 · full original tablePDF page 10 ↗Printed page 5 · full original tablePDF page 11 ↗Printed page 6 · full original tablePDF page 12 ↗Printed page 7 · full original tablePDF page 13 ↗Printed page 8 · full original tablePDF page 14 ↗Printed page 9 · full original tablePDF page 15 ↗Printed page 10 · full original tablePDF page 16 ↗Printed page 11 · full original tablePDF page 17 ↗Printed page 12 · full original tablePDF page 18 ↗Printed page 13 · full original tablePDF page 19 ↗Printed page 14 · full original tablePDF page 20 ↗Printed page 15 · full original tablePDF page 21 ↗Printed page 16 · full original tablePDF page 22 ↗Printed page 17 · full original tablePDF page 23 ↗Printed page 18 · full original tablePDF page 24 ↗Printed page 19 · full original tablePDF page 25 ↗Printed page 20 · full original tablePDF page 26 ↗Printed page 21 · full original tablePDF page 27 ↗Printed page 22 · full original tablePDF page 28 ↗Printed page 23 · full original tablePDF page 29 ↗Printed page 24 · full original tablePDF page 30 ↗Printed page 25 · full original tablePDF page 31 ↗Printed page 26 · full original tablePDF page 32 ↗Printed page 27 · full original tablePDF page 33 ↗Printed page 28 · full original tablePDF page 34 ↗Printed page 29 · full original tablePDF page 35 ↗Printed page 30 · full original tablePDF page 36 ↗Printed page 31 · full original tablePDF page 37 ↗Printed page 32 · full original tablePDF page 38 ↗Printed page 33 · full original tablePDF page 39 ↗Printed page 34 · full original tablePDF page 40 ↗Printed page 35 · full original tablePDF page 41 ↗Printed page 36 · full original tablePDF page 42 ↗Printed page 37 · full original tablePDF page 43 ↗Printed page 38 · full original tablePDF page 44 ↗Printed page 39 · full original tablePDF page 45 ↗Printed page 40 · full original tablePDF page 46 ↗Printed page 41 · full original tablePDF page 47 ↗Printed page 42 · full original tablePDF page 48 ↗Printed page 43 · full original tablePDF page 49 ↗Printed page 44 · full original tablePDF page 50 ↗Printed page 45 · full original tablePDF page 51 ↗Printed page 46 · full original tablePDF page 52 ↗Printed page 47 · full original tablePDF page 53 ↗Printed page 48 · full original table
PLAN YOUR QUANTITIES

Your reference estimate

Add a checked rate with the + button. Quantities use the exact unit shown.

Your estimate is empty. Add materials or work items above.

Reference subtotal
0.00 ETB
Not a VAT calculation. No tax or delivery amount is added automatically.

Request current quote ↗
Budget reference only. Check that selected scopes do not overlap; for example, supply rebar and reinforcement work are separate reference types. No order is placed or message sent.

Before you use a rate

Are these current Conmart selling prices?

No. They are rates from the supplied Addis Ababa construction cost document for 2018 E.C. Q4. Request a current quote for availability, brand, specification and delivery terms.

Does “2018” mean Gregorian 2018?

The document uses the Ethiopian calendar and identifies the 2018 E.C. fourth quarter. The cover letter is dated 30/10/2018 E.C. The original period is retained to avoid confusion with Gregorian years.

Are VAT and transport included?

PDF page 49 explicitly says material selling prices are without VAT. Its note includes loading, unloading and transportation. Do not automatically apply that note to every work or hire rate. Confirm the relevant scope and tax treatment in your supplier quotation.

What is the difference between supply and work rates?

The material table gives local Grade 75 rebar at 200 ETB/kg. The separate reinforcement work table gives rates by diameter and structure. Similarly, roofing work per m² is different from a roofing sheet sold per running metre.

How should I read the units?

One quintal is 100 kg. m² means square metre; m³ means cubic metre; linear m means running metre. Labour and machinery tables are hourly. Preserve the source unit when entering quantities.

Why do some categories open original tables?

The source is scanned. Checked transcriptions are searchable and available for estimates. The complete source pages preserve all remaining rates, specifications and qualifications without publishing unverified OCR numbers.

CONMART · Build with clarity.
Source: Addis Ababa City Administration Design and Construction Works Bureau
2018 E.C. Q4 · 53-page supplied PDF